Project Execution as per standard specifications
 
Civil Work
  •  
Construction of approach road.
  •  
Foundation for Wind Electric Generators (WEGs).
  •  
Control room.
Electrical Work
  •  
Dedicated Substation (If required).
  •  
Consumer DP Erection.
  •  
Transmission line connecting the WEGs to Electricity Board (EB) metering point. 
  •  

Transmission line from Wind Farm to EB Sub Station.

 
Mechanical Work
  •  
Materials shifting to site.
  •  
Tower assembly and erection.
  •  
Erection of WEG.
Pre-commissioning
  Standard checks and tests will be conducted throughout the system including safety checks which require to be carried out for successful commissioning.

Commissioning
   Connecting the WEG to EB metering point and grid after EB approval.
 
Post commissioning activities
  •  
Optimum operation of wind farms.
  •  
Comprehensive maintenance of wind farms including timely supply of spares.
  •  
Power marketing.
  •  
Billing and payment collection.
 
 