Materials
shifting to site. |
|
|
Tower
assembly and erection. |
|
|
Erection
of WEG. |
|
Pre-commissioning |
| |
Standard checks and tests will be
conducted throughout the system
including safety checks which
require to be carried out for successful
commissioning.
|
|
|
Commissioning |
| |
Connecting the WEG to EB metering point and grid after EB approval.
|
|
|
| |
|
Post commissioning activities |
|
|
Optimum operation of wind farms. |
|
|
Comprehensive maintenance of wind
farms including timely supply of spares. |
|
|
Power
marketing. |
|
|
Billing and payment collection.
|
|
| |